01 / PROJECT OVERVIEW
Confirmed project scope and model context.
The main PEB frame for this poolside restaurant shed was modelled in Tekla Structures 2025. The project record confirms steel detailing for fabrication and erection, connection detailing, and coordinated model and drawing outputs.
02 / CHALLENGE & CONSTRAINTS
Geometry, access and interfaces
The detailing review focused on fabrication access, bolt-tightening access, member orientation and clear erection information around the main structural steelwork.
03 / DETAILING APPROACH
Model coordination approach
The main frame geometry was coordinated in Tekla Structures, with practical attention to member orientation, access and how the model information would be communicated in the drawings.
04 / FABRICATION & CONSTRUCTABILITY CHECKS
Practical checks guided by the model
The review considered fabrication access, welding access, bolt installation and tightening access, tool clearance, member orientation, clashes and erection-drawing clarity.
05 / DELIVERABLES
Agreed Project Issue Package
- Coordinated 3D Tekla model
- Erection drawings
- Shop drawings
- Connection details
06 / PRACTICAL TAKEAWAY
Fabrication-First Insight
A coordinated model needs equally clear fabrication and erection information. Reviewing member orientation, tool clearance and access early helps reduce avoidable fabrication or erection questions.